Automation Engineering for Public Board Corporation, Bedok & Kranji
![Infrastructure and Utilities Success Story 4 Infrastructure and Utilities Success Story 4](https://sarlatech.com/wp-content/uploads/2018/07/Water-Treatment-1-610x296.jpg)
![Infrastructure and Utilities Success Story 4 Infrastructure and Utilities Success Story 4](https://sarlatech.com/wp-content/uploads/2018/07/Water-Treatment-1-610x296.jpg)
Business Case
- The project was to develop an automation solution for water treatment & blending facility in the plant
- Processes includes Caustic Dosing, Chlorination & Blending Facility in the plant
Systems and Tools
- Schneider Quantum CPU 65150 as Local Station
- Central Quantum CPU 67160 Hot Stand by
- Vijeo Designer and Vijeo Citect
- Unity Pro-XL
Project Scope
- Develop standard library
- Design and develop the system using PLC, SCADA and HMI application
- FAT and Test the automation system for the established parameters
- Extended Pre-Commissioning, Commissioning and Site support