Automation Engineering for Cooling Plant at Saudi Arabia

Infrastructure and Utilities Success Story 8
Business Case
  • The project was to develop an reliable solution for automating the control process like energy transfer station and power monitoring for cooling plant
  • The expectations was to have simple and optimal solution
Systems and Tools
  • Schneider Quantum 140 CPU 67160 Hotstandby
  • M340 PLC
  • BMXPRA0100 Peripheral Remote I/O Adapter
  • XBTGT 2330 Mesalis HMI
  • Vijeo Citect SCADA
Project Scope
  • Automate the control for processes like Chillers section, Condenser section, Makeup water, Energy transfer station and Power monitoring
  • Develop the PLC Program and SCADA platform
  • Panel Testing and Factory Acceptance Test (FAT)
Related Success Stories Of Infrastructure & Utilities
Top