Business Case
  • The customer required commissioning for the coal mill and coal dosing system for Line-1 and Line-2 at its cement plant to provide additional fuel supply to the kiln and gradually shift from diesel firing to coal firing.
Systems and Tools
  • Line-1 & Line2
  • Siemens PLC S7-400 system & Simatic Step7 v5.5 SP4
  • ACESYS v7.7 library for Siemens Step7 SR2 ECS v7.9
  • Line-4 Siemens PLC S7-400 system    
  • Siemens  PCS7 v8.0 SP2 with CEMAT v8.0 SP1 & PCS7 Advanced Engineering System v8.0 SP1
Project Scope
  • Commissioning support for coal mill and coal dosing system for line-1 and line-2 (FLS based)
  • Pre-commissioning of coal mill and coal dosing system for line-4 (PCS CEMAT based)